![]() ![]() Relief to Mira Bhayander residents to reach Andheri. Updates (February 2023): Metro Route line 9 (Dahisar to Mira Bhayander) Phase 1 will be operational by 2024. Stations Renamed: 3 Stations Names on Line 2A on Link Road are renamed, Pahad Eksar (Borivali West) is Renamed to Shimpoli, Valnai Station is now called ‘Valnai Meeth Chowky’, and Pahadi Goregaon is now renamed to ‘Bangur Nagar’. From Mankhurd this line will be again connected to Navi Mumbai Airport Metro Station, Which will be developed by CIDCO. ![]() Hot Updates (May 2023): A New Connecting 35 Kilometer long metro line 8 ‘Airport Express Line’ will be developed between Mumbai International Airport and Upcoming Navi Mumbai Airport.ĬSMIA will also be connected to Mankhurd which will be about 11 Km. Below are complete details, facilities, the latest pictures of each route, and interconnectivity with other Metro stations & other local train stations that will help understand the complete route map. AC metro coaches have been a blessing for the last 8 years and a total of 13 routes are planned to Connect Mumbai to Suburban, Thane & Palghar districts, Central & Western Railway routes including Navi Mumbai.Īfter a long list of works like Soil Investigation, Utility, Piling, Pile Cap, Pier, Pier Cap, U Girder, Station work, Various tests, and more, Metro trains are been thrown open to the public one by one. Starting in June 2014, Mumbai metro trains were the need of time, and Line 1 (Versova to Ghatkopar) got opened to the public journey. Complete updated details of all Metro Lines, Routes, Inter-Connectivity, etc below. ![]() From 20th January Public is allowed to take benefits. On 19th January 2023, 2 more routes of Mumbai Metro Trains (Lines 7 & 2A) is set open by MMRCL (Mumbai Metro Rail Corporation Limited). ![]()
0 Comments
Leave a Reply. |
AuthorWrite something about yourself. No need to be fancy, just an overview. ArchivesCategories |